1.

The incremental cost characteristics of the two plants are,
IC1 = 0.2P1 + 5 Rs/MWh
IC2 = 0.1P2 + 10 Rs/MWh
The total load is 40 MW, what is the optimal sharing of load ?

Exam Year(s)

RSMSSB JE - 2025, RSMSSB - 2025,

Answer: D

The optimal sharing is P1 = 30 MW and P2 = 10 MW.

Neglecting losses, the load is shared most economically when both plants run at the same incremental cost, with \(P_{1} + P_{2} = 40\).

\[ \begin{aligned} 0.2P_{1} + 5 &= 0.1P_{2} + 10 \\ 0.2P_{1} + 5 &= 0.1(40 - P_{1}) + 10 \\ 0.3P_{1} &= 9 \\ P_{1} &= 30,\ P_{2} = 10 \end{aligned} \]

Check: \(IC_{1} = 0.2(30) + 5 = 11\) and \(IC_{2} = 0.1(10) + 10 = 11\) Rs/MWh, equal as required. Any other split leaves the incremental costs unequal; for example 10 and 30 MW gives 7 and 13 Rs/MWh, so shifting load to plant 1 would cut the total cost.

Please log in or register to report this question.

Loading…
Tags: Economic Load Dispatch Questions and Answers || Economic Load Dispatch MCQ Questions and Answers || Economic Load Dispatch GK Questions and Answers || Economic Load Dispatch GK MCQ Questions || Economic Load Dispatch Multiple Choice Questions and Answers || Economic Load Dispatch GK || GK on Economic Load Dispatch || Power System Operation and Control Questions and Answers || Power System Operation and Control MCQ Questions and Answers || Power System Operation and Control GK Questions and Answers || GK on Power System Operation and Control