A building with an isolated period of 2.5 s stands on a site whose predominant period is also about 2.5 s. The system is
Answer: B
Matching the site period invites the largest demand the site can deliver, which is the opposite of what isolation is meant to achieve. A different isolated period, more damping, or a different strategy altogether would be needed there.