Machine-translated by Google. Questions are authored in English.
Top

Discussion

For the same volume of production, process layout needs ................. space as compared to product layout.

  • A.less
  • B.equal
  • C.more
  • D.cannot be determined

Answer: C

Process layout needs more space than product layout for the same output.

In a process (functional) layout, similar machines are grouped into departments and jobs move between them in different sequences. Material travels farther, work waits between operations, and room is needed for work-in-progress stocks and for aisles and handling, so floor space requirements are higher.

In a product (line) layout, machines are arranged in the sequence of operations for one product, material flows straight through and little work-in-progress builds up, so it uses space more economically. The space difference is well established, so it can be determined and is not equal.

No comment is present. Be the first to comment.
Loading…

Post your comment

Please log in or register to post a comment.