Machine-translated by Google. Questions are authored in English.
Top

Discussion

Arrange the stages of a rolling update in order.
1. new pods pass their readiness probes
2. the desired image in the Deployment is changed
3. old pods are terminated
4. the controller creates pods with the new image

  • A.2 - 4 - 1 - 3
  • B.3 - 1 - 4 - 2
  • C.4 - 2 - 1 - 3
  • D.2 - 1 - 4 - 3

Answer: A

Termination waits for readiness so that capacity is never lost during the update. A readiness probe that always passes defeats the protection entirely. Capacity is preserved throughout. Old pods wait for the new to be ready.

No comment is present. Be the first to comment.
Loading…

Post your comment

Please log in or register to post a comment.