Machine-translated by Google. Questions are authored in English.
Top

Discussion

Requirements flow-down refers to

  • A.Copying requirements from a previous aircraft
  • B.Deriving lower-level requirements
  • C.Reducing the number of requirements over time
  • D.Deleting requirements that prove difficult

Answer: B

Each level's requirements must be shown to satisfy the level above, so that meeting every component requirement guarantees meeting the aircraft's. Maintaining that traceability is the central discipline of systems engineering on a large programme.

No comment is present. Be the first to comment.
Loading…

Post your comment

Please log in or register to post a comment.