Machine-translated by Google. Questions are authored in English.
Top

Discussion

In the V-model the right-hand arm consists of

  • A.the test activities corresponding to each design activity
  • B.the implementation of each module in turn
  • C.the maintenance activities after release
  • D.the review of the requirements by the customer at the outset

Answer: A

Each level of decomposition on the way down has a matching level of verification on the way up: unit tests against the detailed design, integration against the architecture, acceptance against the requirement. The shape makes it plain what each test is testing against.

No comment is present. Be the first to comment.
Loading…

Post your comment

Please log in or register to post a comment.