Machine-translated by Google. Questions are authored in English.
Top

Discussion

A fault found in production costs more than the same fault found in design chiefly because

  • A.the fault will be more complex by then
  • B.the requirements will have changed in the interval
  • C.units already built and shipped must be corrected
  • D.production engineers are more expensive than designers

Answer: C

Rework, recall, field visits and reputation all attach to a fault that has escaped, and the engineering to fix it is the smallest part of the bill. That escalation is the whole economic argument for review and test at every stage.

No comment is present. Be the first to comment.
Loading…

Post your comment

Please log in or register to post a comment.