Discussion
A production test jig should be designed
Answer: A
Correct answer: alongside the product, not after it
Designing the test jig with the product is what makes the product testable: test points get placed, a diagnostic mode gets included, connectors are made accessible. Left until after the design is frozen, the jig has to work with whatever access happens to exist, and the usual result is a test that is slow, incomplete or impossible.
No comment is present. Be the first to comment.
Loading…
Post your comment
Please log in or register to post a comment.
Examination Categories
- SSC Exams
- Banking Exams
- Teaching Exams
- Civil Services Exams
- Railways Exams
- Engineering Recruitment Exams
- Defence Exams
- State Government Exams
- Police Exams
- Insurance Exams
- Nursing Exams
- Other Government Exams
- NRA CET
- PG Entrance Exams
- Campus Placement
- MBA Entrance Exams
- CUET and UG Entrance
- Judiciary Exams
- Regulatory Body Exams
- Software Development