The rule of thumb that a small number of systems account for most of the consumption is applied in an audit to
Answer: C
Twenty per cent of the equipment commonly carries eighty per cent of the load, so measuring everything equally wastes the budget. Ranking the systems by consumption before choosing what to instrument is the practical application.