A consumer drawing a maximum demand of 500 kW and consuming 200 000 kWh over a 720 hour month has a load factor of
Answer: C
Correct answer: 55.6 per cent
Load factor is the energy actually taken as a fraction of what would have been taken at the maximum demand throughout: \[ \frac{200\,000}{500 \times 720} = \frac{200\,000}{360\,000} = 0.556. \] A high load factor means the capacity provided is well used, which is why tariffs reward it - the demand charge falls per unit as the load factor rises.
No comment is present. Be the first to comment.
Loading…
Post your comment
Please log in or register to post a comment.
Examination Categories
- SSC Exams
- Banking Exams
- Teaching Exams
- Civil Services Exams
- Railways Exams
- Engineering Recruitment Exams
- Defence Exams
- State Government Exams
- Police Exams
- Insurance Exams
- Nursing Exams
- Other Government Exams
- NRA CET
- PG Entrance Exams
- Campus Placement
- MBA Entrance Exams
- CUET and UG Entrance
- Judiciary Exams
- Regulatory Body Exams
- Software Development