Arrange these steps of a normal gas turbine start in the order the instruments confirm them:
1. Rotor speed rises as the starter turns the engine
2. Fuel flow is introduced at the light-up speed
3. Exhaust gas temperature rises as combustion begins
4. Oil pressure rises with increasing rotor speed
5. The engine stabilises at idle and the starter cuts out
Select the correct sequence.
Answer: C
Each step has an instrument that confirms it, and the crew watches for a missing confirmation rather than for a fault message. A rising temperature without rising speed is the hung start the sequence is designed to catch.
No comment is present. Be the first to comment.
Loading…
Post your comment
Please log in or register to post a comment.
Examination Categories
- SSC Exams
- Banking Exams
- Teaching Exams
- Civil Services Exams
- Railways Exams
- Engineering Recruitment Exams
- Defence Exams
- State Government Exams
- Police Exams
- Insurance Exams
- Nursing Exams
- Other Government Exams
- NRA CET
- PG Entrance Exams
- Campus Placement
- MBA Entrance Exams
- CUET and UG Entrance
- Judiciary Exams
- Regulatory Body Exams
- Software Development