Machine-translated by Google. Questions are authored in English.
Top

Discussion

Assertion (A): A retained control sample is measured periodically alongside production.
Reason (R): It reveals instrument drift that would otherwise be attributed to the product.

  • A.A is false but R is true
  • B.Both A and R are true, and R is the correct explanation of A
  • C.Both A and R are true, but R is not the correct explanation of A
  • D.A is true but R is false

Answer: B

Both are true and the reason gives the purpose, and the control must itself be stable. Ceramic tiles are preferred over textile samples for this role. A drifting control cannot detect drift. Stability is the first requirement.

No comment is present. Be the first to comment.
Loading…

Post your comment

Please log in or register to post a comment.