Five periodic tasks together demand seventy per cent of the processor. Applying the fixed priority bound test to them shows the set to be
Answer: A
Substituting five into the formula gives 0.743, and being below it is a sufficient condition, so no further analysis is needed. The limiting figure of 0.693 applies only as the number of tasks grows without bound and is always pessimistic for a finite set.