Machine-translated by Google. Questions are authored in English.
Top

Discussion

Which quantity must be estimated before helicity can be computed?

  • A.The depth of the boundary layer, which determines the level from which the inflow into the storm originates
  • B.The storm motion vector
  • C.The temperature at the level of free convection, which determines the buoyancy available to the updraught
  • D.The cloud base height

Answer: B

Helicity is defined relative to the moving storm, so an estimate of the storm motion is required, usually obtained from an empirical rule based on the mean wind and the shear. The Bunkers method is the current standard. Because right moving supercells deviate from the mean wind, using the mean wind instead would substantially underestimate the helicity available to them. Naming the cost of a choice alongside its benefit is what turns a fact into a design decision.

No comment is present. Be the first to comment.
Loading…

Post your comment

Please log in or register to post a comment.