Machine-translated by Google. Questions are authored in English.
Top

Discussion

The ordinates of a 6-hour S-hydrograph of a catchment are given in Table below. The catchment has phi-index of 0.25 cm h-1 and baseflow of 10.5 m3 s-1. The peak of the flood hydrograph generated from this catchment due to a storm of 45 mm received during the first 6 h in m3 s-1 is

Time (h)0612182430364248
Ordinate (m3 s-1)03090180252306342360360

  • A.259.5
  • B.270.0
  • C.280.5
  • D.349.5

Answer: C

The peak of the flood hydrograph is 280.5 m3/s.

The 6-hour unit hydrograph is the S-curve minus itself lagged by 6 hours: 0, 30, 60, 90, 72, 54, 36, 18, 0 m3/s at 0, 6, ..., 48 h, with a peak of 90 m3/s at 18 h.

\[ \begin{aligned} \text{loss} &= 0.25 \times 6 = 1.5\ \text{cm} \\ \text{excess} &= 4.5 - 1.5 = 3.0\ \text{cm} \\ \text{peak} &= 3 \times 90 + 10.5 = 280.5 \end{aligned} \]

270.0 is the peak direct runoff without the baseflow, and 259.5 subtracts the baseflow instead of adding it. 349.5 would need 339 m3/s of direct runoff, far more than 3 cm of rainfall excess can produce from a unit hydrograph whose peak is 90 m3/s per cm.

No comment is present. Be the first to comment.
Loading…

Post your comment

Please log in or register to post a comment.