X can do a work in 15 days and Y in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is :

  • A.1/4
  • B.1/10
  • C.7/15
  • D.8/15

Answer: D

Work in rates: someone who finishes a job in \( n \) days does \( \tfrac{1}{n} \) of it a day, and rates add.

\[ 4\left(\frac{1}{15} + \frac{1}{20}\right) = 4 \times \frac{4 + 3}{60} = \frac{28}{60} = \frac{7}{15} \]

\[ \text{left} = 1 - \frac{7}{15} = \frac{8}{15} \]