MPSC AE 2011: Maharashtra Civil Engineering Services Main Examiantion, Civil Engineering - Paper-2

  • Paper code: NA
  • Language: Bilingual
  • 6 pages
MPSC AE 2011 question paper, Maharashtra Civil Engineering Services Main Examiantion, Civil Engineering - Paper-2, page 1 of 6
Page 1 of 6
Text of page 1
HRM
                                                       2011
                               CIVIL ENGINEERING (Paper - 11)
                                                                                             : 3-05?
    Time allowed : 3 Hours )                                                    { Maximum Marks : 200

    Note :
    (i)    Solve any one question from each section.
    (ii)   D; not reproduce any question. Write only question number against the ansurer.
    (iii) Number ojoptional questions up to the prescribed number in the order in which questions have been
          solved, urill only be assessed and excess answers of the question/s will not be assessed.
    (iv) Figures to the right indicate the number of marks for the questions.
    (v) Assume suitable data if necessary and state-it clearly.
    (vi) Use of Non-programmable calculators is permitted.
    (vii) Use of LS. Codes and Steel Table, is not permitted.
    (viii) findidate should not write roll number, any name (including hislher own), signature, address or
           any indicatim of hisher identity any where inside the answer book othemise the candidate will be
           penalised.

                                            SECTION - "A"


    1.     (a)   Discuss the temporary adjustment of Transit Theodolite. How would you measure          10
                 the horizontal angle by repetition method ?
           @)    Determine the gradient from point 'Fto point 'Q' from the following observations       10
                 made with a tacheometer fitted with an anallactic lens. The constant of instrument
C                was 100 and staff was held vertically.

                    inst.      staff     Bearing       Vertical        Staff readings
                   station    station                  AngM        +.b        m          T
                      P          A         130          10°32'    1.36      1.915       2.470
                                 B         220           5°C      1.065     1.885       2.705

           (c)   Two straight lines 'AB' and ' B C are intersected by a line 'DID;. The L B DID2        10
                 and L B D2D1 are 40° 30' and 36" 24' respectively. The radius of first arc is
                 600 m. and that of second arc is 800 m. If the chainage at point of intersection
                 point 'B' is 8248. 10m. Calculate the chainage of Tangent Points and point's of
                 compound curve.


                                                                                                   P.T.O.
MPSC AE 2011 question paper, Maharashtra Civil Engineering Services Main Examiantion, Civil Engineering - Paper-2, page 2 of 6
Page 2 of 6
Text of page 2
HRM                                                    2


     (d) The following consecutive readings were taken with dumpy level and 4m leveling          10
         staff on a continuously slqping ground at a common interval of 30 m.
           The elevation of point A was 520.45 m. make up a level book and apply usual
           checks. Also determine the gradient of line AB. The staff readings are as follows.
           Staff reading on A = 0.585, 0.936, 1.953, 2.846, 3.644, 3.938, 0.962, 1.035, 1.689,
           2.534, 3.844, 0.956, 1.579.
           Staff reading on B = 3.016.


2.   (a)   The table gives the latitude and departure of sides of closed Traverse ABCDA.         10
           Calculate the independent co-ordinate of each station and the area of closed
                                                                                                      Q
           Traverse ABCDA.

           Side         Latitude                  Departure
                     N             S             E        W
           AB       214.8                      124.0
           BC                  245.10         205.70
           CD                  155.90                    90.00
           DA       186.20                              239.70

     @)    Discuss the advantages and disadvantages of plane table surveying.                    10
     (c)   What do you mean by local attraction. Following bearings were observed on a           10
           closed Compass Traverse. Calculate the interior angle and correct it for
           observational error taking the bearing of line BC as correct. Find the corrected
           bearing of remaining sides of the closed traverse :
                                                                                                      d
             Line         F.B.                8.8.
             AB         191" 15'             10"15'
             BC         120" 45'            300" 45'
             CD         339" 5'             169" 00'
             DE         339" 35'            160" 40'
             EA         296" 00'            115" 00'

     (d)   An Instrument set up at     'r
                                        and angle of depression to a vane 2m above the foot      10
           of the staff held at 'Q' was 5" 36'. The horizontal distance between   'r
                                                                                   and 'Q'
           was known to be 3000m. Determine the R.L. of staff station 'Q' given that staff
           reading on a B.M. of elevation 456.050 was 2.865 m.
MPSC AE 2011 question paper, Maharashtra Civil Engineering Services Main Examiantion, Civil Engineering - Paper-2, page 3 of 6
Page 3 of 6
Text of page 3
HRM

                                           SECTION - "8"

    3.    (a)   Give account of any three standard sizes for 23 cm bricks as prescribed by FWD 10
                in India along with mould sizes.
                What is effect of presence of oxide of iron and alkali in brick earth on brick a f t e ~
                burning ?
          @)    How is lime classified ? State suitability of each for application like masonry and 10
                plastering with reasons.
          (c)   Compare Granite, Basalt, lime stone, and Laterite on the basis of suitability for
                construction type, geological classification, structure, and requirement of
                seasoning.
c        .(d)   Explain various steps involved in preparation of surface of new wood work for
                painting, with reasons.
                                                                                                         10



    4.    (a)   How is built environment different from natural environment ? Why is an                 10
                integrated approach essential in building planning ?
                                                                                                        10
          (b)   Explain essential climatic considerations in building planning with suitable
                examples.
                Explain lighting and ventilation requirements for habitable room, sanitary annexe       10
          (c)
                (WC and Bath), Stairway, and basement as per building bye laws.
                What are precautionary measures to avoid acoustical defects in an auditorium.           10
          (d)
                Also explain use of Sabine's expression to work out ORT for an auditorium.

                                           SECTION - "C"


    5.    (a)   Describe the procedure for empirical design of shallow stepped foundation for           10
e               load bearing wall.
          (b)   Explain in brief the points to be observed in supervising brick work.                   10
          (c)   Enlist and explain the contract documents.                                              10
          (d)   Find out the book value, after 40 years, of an asset costing Rs. 4.0 lakhs,             10
                assuming 100 years as life of the asset and the salvage value of
                Rs. 20,000/-. What would be the book value after 30 years of life if the salvage
                value is nil ? (Assume straight line depreciation).


    6.    (a)   Explain the difficulties faced and precautions to be taken for foundations of           10
                buildings in black cotton soils.
          (b)   Draw a roof plan for pitched roof and explain the components and technical              10
                terms in pitched roof.
MPSC AE 2011 question paper, Maharashtra Civil Engineering Services Main Examiantion, Civil Engineering - Paper-2, page 4 of 6
Page 4 of 6
Text of page 4
HRM                                         6


  (d)   A construction project consists of 10 activities as shown below :




        Draw Network diagram and find out all critical activities. Also show activity
        wise float in tabular form.

                                         -000-
MPSC AE 2011 question paper, Maharashtra Civil Engineering Services Main Examiantion, Civil Engineering - Paper-2, page 5 of 6
Page 5 of 6
Text of page 5
(c)   Compare in detail the item rate contract and percentage rate contract.                 10
     (d)   Prepare an approximate estimate for a G + 3 RCC fiamed structure. The built up         10
           area on ground floor is 500 m2, and on every successive floor it is reduced by 10%
           of ground floor built up area. The built up area rate for ground floor is
           Rs. 10,000/- per square meter, and for every higher floor there is a hike of
           Rs. 1000/- in this rate. Cost of electrification and plumbing is 15% of building
           cost. Provide 5% of total cost for contingencies and work - charged establishment.


                                        SECTION - "DM

                                                                                                       m
                                                                                                       ..
7.   (a)   Draw a neat sketch of plasticity chart suggested by IS 1498 and explain how it is      10 ,
                                                                                                     ,
           used to classify soils.
     (b)   List out assumptions made by Boussinesq for stresses induced in a soil mass due        10
           to concentrated point load and write Boussinesq equation for stress due to point
           load in a soil mass. Give meaning of all the terms in the equation.

     (c)   Define optimum moisture content and explain how the compaction of soil is              10
           controlled in the field. Also list out the factors which affect compaction.
     (d)   Explain plate load test with a neat sketch and explain what are its limitations.       10


8.   (a)   A retaining wall 4 m high, has a smooth vertical back. The backfill has a horizontal   10
           surface in level with the top of the wall. There is uniformly distributed surcharge
           load of 36 K N / ~ ~ intensity over the backfill. The unit weight of the backfill is
           18 KN/m2, its angle of shearing resistance is 30" and cohesion is zero. Determine



     (b)
           the magnitude and point of application of active earth pressure per metre length
           of the wall.
           An undisturbed sample of soil has a volume of 100 cm3 and mass 190 g. On oven          10
                                                                                                       -
                                                                                                       -,




           drying for 24 hours, the mass is reduced to 160 g. If the specific gravity of soil
           particles is 2.68, determine the water content, voids ratio and degree of saturation
           of the soil.
     (c)   With necessary sketches explain sand replacement method to find field density of       10
           soil in the field.
     (d)   A normally consolidated clay stratum of 3 m thickness has two permeable layers         10
           at its top and bottom. The liquid limit and the initial void ratio of the clay are
           36% and 0.82 respective1 , while the initial overburden pressure at the middle of
                                    Y
           the clay layer is 2 kg/cm . Due to the construction of a new building this pressure
           increases by 1.5 kg/cm2. Compute the probable consolidation settlement of the
           building.

                                                                                              P.T.O.
MPSC AE 2011 question paper, Maharashtra Civil Engineering Services Main Examiantion, Civil Engineering - Paper-2, page 6 of 6
Page 6 of 6
Text of page 6
HRM

                                            SECTION    - "E"

    9.   (a)   What is meant by Scientific management ? How are the methods of Scientific            10
               management adopted for the construction jobs ?

         (b)   A construction project carries out seven activities as shown below :                  10

                     Activity           Dependancy             Duration
                       A        Initial Activity                5 days
                        B       Initial Activity                5 days
                        C       Depends upon Activity A         5 days
                        D       Depends upon Activity B        10 days
                        E       Depends upon Activity B         5 days
                        F       Depends upon C and D            10 days
                        G       Depends upon Activity E         10 days


               Calculate EST, EFT, LST, LET,by drawing Network diagram. Also show aitical
               path.
         (c)   (i)      Using the straight line method of depreciation, determine the annual cost    5
                        of depreciation for a tractor whose initial cost is Rs. 17,50,000/- if the
                        assumed life is 7 years with an Estimated Salvage Value of Rs.22,OW/-
               (ii)     Explain in brief the causes of Accidents.                                     5

         (d)   What do you mean by Store Management ? What principles are normally adopted           10
a              to store construction material ?


    10. (a)    Draw a neat sketch showing the basic parts of "Drag line."                            10

         (b)   What are the important features of ABC Analysis ?                                     10
         (c)   Define :
               (i)      Accident Cost
               (ii)     Injury frequency rate
               (iii) Injury Severity rate

               (iv) Safety equipments in construction industry

                                                                                                 P.T.O.
Page 1 of 6

Source: Maharashtra Public Service Commission. Question paper published by Maharashtra Public Service Commission.