Energy Management Principles Questions and Answers

41.

Match the element with what it establishes.

1. Energy review   2. Energy performance indicator   3. Energy baseline

P. The reference against which performance is judged   Q. Where the energy goes and what can be improved   R. The measure by which performance is tracked

Answer: A

The three are the technical core of the system and are constantly confused: the review is the investigation, the indicator is the measure and the baseline is the reference. An indicator without a baseline reports a number nobody can judge.

Please log in or register to report this question.

42.

Match the activity with the stage of the cycle it belongs to.

1. Setting objectives   2. Operating to the control criteria   3. Management review

P. Act   Q. Plan   R. Do

Answer: B

Correct answer: 1-Q, 2-R, 3-P

Setting objectives is planning, operating to the control criteria is doing, and the management review is acting - the stage at which the organisation decides what to change on the strength of what the checking found. Checking, the remaining stage, covers the monitoring and internal auditing that feed that review.

Please log in or register to report this question.

43.

Consider the following statements about energy management.

1. Certification to the standard attests to the system rather than the efficiency   2. Competence requirements follow the significant energy uses   3. Correction of a nonconformity is the same as corrective action

Answer: C

Correct answer: 1 and 2 only are correct

Statements 1 and 2 are correct: certification attests that a system is in place and working, not that the site is efficient, and competence requirements are targeted at the people who influence the significant energy uses. Statement 3 conflates two distinct things - correction fixes the particular nonconformity, while corrective action addresses the cause so that it does not recur. Doing only the first is why the same finding reappears at every audit.

Please log in or register to report this question.

Answer: D

Correct answer: achieving a stated absolute level of energy efficiency

The standard requires a system and continual improvement of energy performance, not the attainment of any particular efficiency - which would be meaningless across industries and plants of different ages. Identifying the significant energy uses, establishing performance indicators and holding management reviews at planned intervals are all genuine requirements.

Please log in or register to report this question.

Answer: A

The measures belong in the action plan, which changes yearly, whereas the policy should stand for several years. Putting a schedule into the policy means either revising the policy constantly or leaving it out of date.

Please log in or register to report this question.

Answer: B

A rise in output or a hotter summer can conceal a real improvement entirely, and an unnormalised indicator will show it. Establishing that before questioning the measures avoids abandoning a programme that is in fact working.

Please log in or register to report this question.

Answer: C

Correct answer: nobody has been made accountable for the readings

Metering produces information, and information alone changes nothing. Consumption falls when someone owns a number, is measured against it and has the authority to act on what it shows. Sub-metering without that accountability is a common and expensive disappointment, and the remedy is organisational rather than technical.

Please log in or register to report this question.

Answer: D

Production, purchasing and engineering must all act, and only the level above them can require it and fund it. That authority is precisely why the signature matters and why a policy signed lower down achieves so little.

Please log in or register to report this question.

Answer: A

Continual improvement is indeed required, which is what the reason states, but improvement from a poor starting point still leaves a poor absolute performance. The certificate attests to the management arrangements and not to any level of efficiency.

Please log in or register to report this question.

50.

Comparing an energy programme driven by a capital budget with one driven by a management system, the management system

Answer: B

Projects produce a step change and then decay as controls drift, whereas the system's monitoring, operational control and review are what keep the step in place and find the next one. The two are complementary rather than alternatives.

Please log in or register to report this question.

Loading…
Tags: Energy Management Principles Questions and Answers || Energy Management Principles MCQ Questions and Answers || Energy Management Principles GK Questions and Answers || Energy Management Principles GK MCQ Questions || Energy Management Principles Multiple Choice Questions and Answers || Energy Management Principles GK || GK on Energy Management Principles || Energy Conservation and Management Questions and Answers || Energy Conservation and Management MCQ Questions and Answers || Energy Conservation and Management GK Questions and Answers || GK on Energy Conservation and Management