The overall lesson of this topic is that
Answer: C
Payload, range, field length and the certification basis between them fix most of what the aircraft will be. Treating requirements capture as administrative rather than as the first and most consequential engineering act is a reliable way to build the wrong aeroplane.
Please log in or register to report this question.