Answer: C

A piece rejected after firing and glazing has consumed far more energy and labour than one rejected at the press. This is the argument for inspecting early and often rather than only at the end. Each inspection point is placed where it can save the most cost.

Please log in or register to report this question.

32.

Assertion (A): Inspection is placed as early in a ceramic process as the defect can be detected.
Reason (R): A piece rejected later has consumed more energy and labour than one rejected early.

Answer: D

Correct answer: Both A and R are true, and R is the correct explanation of A

Both are true and the reason gives the economics. A defect present in the green body but not found until after firing has consumed the drying energy, the kiln time, the kiln furniture space and the handling in between. Detecting it at forming costs the material alone. The principle sets where inspection is placed: as early as the defect can be seen, not where it is most convenient to look.

Please log in or register to report this question.

33.

Consider the following statements about defect management.
1. Fractography identifies the flaw that initiated a fracture.
2. Process control detects drift before defects appear.
3. Final inspection alone is sufficient for quality assurance.

Answer: A

Correct answer: 1 and 2 only

Statements 1 and 2 are correct: fractography identifies the initiating flaw, and process control catches drift before it produces defects at all. Statement 3 is the belief the other two exist to displace - final inspection finds defects after every cost of making them has been incurred, and it cannot find those it does not test for.

Please log in or register to report this question.

34.

State whether the following is true or false.
Inspecting the finished product is enough to assure quality.

Answer: B

Correct answer: False

Inspection sorts good from bad; it does not make anything good. By the time a piece is inspected the cost of making it has been spent, the causes are several steps upstream and no longer visible, and any test short of destruction samples only part of what could be wrong. Quality is assured by controlling the process that produces the pieces, with inspection as confirmation rather than as the mechanism.

Please log in or register to report this question.

Answer: C

Correct answer: checking the incoming raw materials first

A step change in rejects with no change in the process points to a change in something entering the process, and the raw materials are the largest and most variable input - a new clay lot, a different consignment of feldspar, a shift in moisture. Checking them costs a morning. Altering the firing to compensate would mask the cause and leave the plant permanently mis-set once the material changed back.

Please log in or register to report this question.

36.

State whether the following is true or false.
Retaining samples of raw materials and finished product helps in investigating defects.

Answer: D

Comparing a problem batch against a known good one is often the quickest route to a cause. Without retained samples the investigation rests on records alone and usually stalls quickly. Retention periods are set against how long a fault might take to emerge.

Please log in or register to report this question.

Loading…
Tags: Defects in Ceramic Processing Questions and Answers || Defects in Ceramic Processing MCQ Questions and Answers || Defects in Ceramic Processing GK Questions and Answers || Defects in Ceramic Processing GK MCQ Questions || Defects in Ceramic Processing Multiple Choice Questions and Answers || Defects in Ceramic Processing GK || GK on Defects in Ceramic Processing || Ceramic Processing Questions and Answers || Ceramic Processing MCQ Questions and Answers || Ceramic Processing GK Questions and Answers || GK on Ceramic Processing