The cost of a defect rises through the process because
Answer: C
A piece rejected after firing and glazing has consumed far more energy and labour than one rejected at the press. This is the argument for inspecting early and often rather than only at the end. Each inspection point is placed where it can save the most cost.
Please log in or register to report this question.