Answer: C

Anchor capacity depends heavily on hole cleaning, resin mixing and curing, none of which can be seen once installed. A pull-out test on a proportion of the anchors is the only practical confirmation that the workmanship was adequate.

Please log in or register to report this question.

Answer: D

Stiffening one side, one storey or one direction can produce torsion or a soft storey where none existed. Checking the retrofitted building as a whole, rather than only the members being strengthened, is what catches it.

Please log in or register to report this question.

Answer: A

The pattern of cracking is evidence about how the building behaved and where it is deficient, and filling the cracks destroys that evidence. Assessment first, then repair and strengthening together, is the correct order.

Please log in or register to report this question.

Answer: B

Correct answer: the existing structure is reused

The foundations, the frame and the envelope already exist and are paid for, so the retrofit supplies only what is missing. Nothing about the code or the design effort is reduced - assessing an existing building is generally harder than designing a new one, since so much must be discovered rather than specified.

Please log in or register to report this question.

Answer: C

Correct answer: a survey of dimensions and reinforcement

Nothing can be assessed without knowing what is there, so the first task is measurement: member sizes, and the reinforcement found by cover meter and by opening up at selected points. Assuming a design rather than establishing it is the usual way a retrofit comes to be based on a building that does not exist.

Please log in or register to report this question.

Answer: D

Recording the building's response to wind and traffic gives the periods and mode shapes directly, which is a valuable check on the analytical model. Repeating the measurement after a retrofit confirms the stiffness that was actually gained.

Please log in or register to report this question.

Answer: A

Partitions, cladding and finishes all contribute stiffness that a bare frame model omits, and at the small amplitudes of ambient vibration they are uncracked and fully effective. Under strong shaking they crack and the period lengthens.

Please log in or register to report this question.

Answer: B

A wall taken out during a refurbishment silently removes the strength the retrofit counted on, and no record of the assumption survives in the building. Where infill is relied on, it is tied into the frame and recorded as structural.

Please log in or register to report this question.

Answer: C

Correct answer: from every floor down to the foundation

A retrofit is only as good as its weakest link, and adding a strong element does no good if the floor cannot deliver force to it or the foundation cannot receive it. The whole path must therefore be traced - which is why diaphragm and foundation checks so often determine the scope of the work.

Please log in or register to report this question.

Answer: D

Correct answer: the floor cannot deliver force to the new elements

New shear walls or braces attract force only if the diaphragm can carry it to them, and an existing floor - timber, precast planks, or a slab now spanning further than it did - frequently cannot. Strengthening the diaphragm is then part of the retrofit rather than an addition to it.

Please log in or register to report this question.

Loading…
Tags: Retrofitting of Structures Questions and Answers || Retrofitting of Structures MCQ Questions and Answers || Retrofitting of Structures GK Questions and Answers || Retrofitting of Structures GK MCQ Questions || Retrofitting of Structures Multiple Choice Questions and Answers || Retrofitting of Structures GK || GK on Retrofitting of Structures || Earthquake Engineering Questions and Answers || Earthquake Engineering MCQ Questions and Answers || Earthquake Engineering GK Questions and Answers || GK on Earthquake Engineering