Agro Processing Plant Design Questions and Answers

41.

Statement I: A diversity factor is applied because consumers are in different departments.

Statement II: Not every consumer draws its maximum demand at the same moment.

In the light of the above statements, choose the correct answer.

Answer: A

Correct answer: Statement I is incorrect but Statement II is correct

The diversity factor has nothing to do with where the consumers are; it exists because they do not all draw their maximum at the same instant. Sizing on the sum of individual peaks would buy capacity that is never called for at once.

Please log in or register to report this question.

42.

Statement I: Payback period alone is a sufficient basis for an investment decision.

Statement II: Payback takes no account of cash flows after the payback point or of the time value of money.

In the light of the above statements, choose the correct answer.

Answer: B

Correct answer: Statement I is incorrect but Statement II is correct

Statement II is exactly why statement I is wrong. Payback ignores everything after the payback point - so a project returning nothing thereafter scores as well as one returning for twenty years - and it ignores the time value of money. It is a useful screen for risk, but the decision needs a discounted measure such as net present value.

Please log in or register to report this question.

43.

Arrange the steps of designing an agro-processing plant in order:

1. Prepare the process flow sheet and material balance

2. Establish the capacity from raw material availability

3. Lay out the equipment and services on the site

4. Select and size the equipment for each stage

Select the correct sequence.

Answer: C

Correct answer: 2, 1, 4, 3

The order is: establish the capacity from raw material availability; prepare the flow sheet and material balance, which fix every stream; select and size the equipment from those quantities; and only then lay it out on the site. Each step supplies what the next needs - you cannot size a machine before you know the flow through it.

Please log in or register to report this question.

44.

Arrange the steps of a capital cost estimate in order:

1. Apply a Lang factor to obtain the fixed capital investment

2. Obtain delivered equipment costs from quotations or correlations

3. Add the two to give the total capital required

4. Estimate working capital as a proportion of fixed capital

Select the correct sequence.

Answer: D

Equipment cost is the anchor for everything else in a factored estimate, and working capital is assessed once the fixed investment is known. A seasonal plant usually needs a larger working capital proportion than the standard figures suggest.

Please log in or register to report this question.

45.

Arrange the material's path through a well-laid-out fruit processing plant:

1. Reception and washing of raw material

2. Preparation, peeling and cutting

3. Thermal processing and filling

4. Packing, labelling and despatch

Select the correct sequence.

Answer: A

Correct answer: 1, 2, 3, 4

Reception and washing, then preparation, peeling and cutting, then thermal processing and filling, then packing and despatch. The sequence matters as much for hygiene as for logic: the material becomes progressively cleaner and more processed as it moves in one direction through the building, so raw and finished product never meet.

Please log in or register to report this question.

46.

Arrange the causal chain of an unbalanced line:

1. One stage is rated well below the others

2. Material accumulates ahead of it and the faster stages idle

3. Plant throughput falls to that stage's capacity

4. Capital invested in the faster stages earns nothing

Select the correct sequence.

Answer: B

Correct answer: 1, 2, 3, 4

The chain runs: one stage is rated below the others → material accumulates ahead of it while the faster stages stand idle → plant throughput falls to that stage’s capacity → the capital in the faster stages earns nothing. The last is the commercial consequence of the first.

Please log in or register to report this question.

47.

Arrange the steps of debottlenecking a line in order:

1. Identify the stage with the lowest rated capacity

2. Uprate or duplicate that stage

3. Identify the new limiting stage

4. Repeat until the target throughput is reached

Select the correct sequence.

Answer: C

Correct answer: 1, 2, 3, 4

Debottlenecking is iterative: find the slowest stage, uprate or duplicate it, find the new limiting stage - because relieving one constraint always reveals another - and repeat until the target is met or the next step costs more than it is worth.

Please log in or register to report this question.

48.

Consider the following pairs of design document and what it shows:

Process flow sheet - Sequence of unit operations and streams

Material balance - Quantities of every stream in the process

Layout drawing - Physical positions of equipment on site

Flow sheet - Electrical single line arrangement

How many of the pairs given above are correctly matched?

Answer: D

Correct answer: Only three

Three pairs are right: the flow sheet shows the sequence of operations and streams, the material balance the quantities in each, and the layout the physical positions. The fourth is wrong - the electrical single line diagram is a separate drawing altogether, and a process flow sheet says nothing about it.

Please log in or register to report this question.

49.

Consider the following pairs of cost item and its category:

Process equipment - Fixed capital

Raw material stocks - Working capital

Buildings and installation - Fixed capital

Depreciation - Working capital

How many of the pairs given above are correctly matched?

Answer: A

Correct answer: Only three

Equipment, buildings and installation are all fixed capital, and raw material stocks are working capital - three correct. The fourth is wrong: depreciation is neither. It is an accounting charge that writes down the fixed capital over time, not a category of capital employed.

Please log in or register to report this question.

50.

Consider the following pairs of layout type and the situation it suits:

Process layout - Low volume and a wide product range

Product layout - High volume and a narrow range

Product layout - Minimum material handling

Process layout - Maximum flexibility for a single product

How many of the pairs given above are correctly matched?

Answer: B

Correct answer: Only three

Three pairs are right: process layout for low volume and a wide range, product layout for high volume and a narrow one, and product layout for minimum handling - the material moves in a straight line. The fourth reverses the argument: process layout gives flexibility across many products, not for a single one, and for a single product a product layout is better in every respect.

Please log in or register to report this question.

Loading…
Tags: Agro Processing Plant Design Questions and Answers || Agro Processing Plant Design MCQ Questions and Answers || Agro Processing Plant Design GK Questions and Answers || Agro Processing Plant Design GK MCQ Questions || Agro Processing Plant Design Multiple Choice Questions and Answers || Agro Processing Plant Design GK || GK on Agro Processing Plant Design || Agricultural Process Engineering Questions and Answers || Agricultural Process Engineering MCQ Questions and Answers || Agricultural Process Engineering GK Questions and Answers || GK on Agricultural Process Engineering