31.

Effluent of \( 240 \) m\(^3\) a day carries a biochemical oxygen demand of \( 1800 \) mg per litre. The daily organic load is

Answer: C

Correct answer: 432 kg

\[ 240\ \text{m}^3 = 240{,}000\ \text{L} \]\[ 240{,}000 \times 1800\ \text{mg/L} = 4.32 \times 10^{8}\ \text{mg} = 432\ \text{kg} \]

The trap is the unit conversion: milligrams per litre times cubic metres gives grams, so a factor of 1000 is easily lost.

Please log in or register to report this question.

32.

Working capital is estimated at \( 15 \) per cent of a fixed capital investment of \( 19.7 \) million. The total capital required is

Answer: D

Correct answer: 22.66 million

\[ \text{Working capital} = 0.15 \times 19.7 = 2.96 \]\[ \text{Total} = 19.7 + 2.96 = 22.66\ \text{million} \]

Working capital is additional to the fixed investment, not part of it - a distinction that matters, since it is recovered at the end of the project rather than written off.

Please log in or register to report this question.

33.

Two layouts require material to travel \( 180 \) m and \( 115 \) m per tonne through the plant. Choosing the shorter reduces travel by

Answer: A

Correct answer: 36.1 per cent

\[ \frac{180 - 115}{180} \times 100 = 36.1\% \]

Travel distance is a fair proxy for handling cost, damage and time in a food plant, which is why layout studies work in metres per tonne.

Please log in or register to report this question.

34.

A stage rated at \( 4.5 \) t/h is replaced by one at \( 6.5 \) t/h in the line of stages \( 6.0 \), \( 4.5 \), \( 7.0 \) and \( 5.5 \) t/h. The new throughput is

Answer: B

Correct answer: 5.5 t/h

Replacing the 4.5 t/h stage leaves stages of 6.0, 6.5, 7.0 and 5.5 t/h, so the new bottleneck is the 5.5 t/h stage. This is the essence of debottlenecking: relieving one constraint simply reveals the next, and the gain here is 1.0 t/h rather than the 2.0 the new machine might suggest.

Please log in or register to report this question.

35.

Statement I: A seasonal processing plant is sized on its annual tonnage divided by 365 days.

Statement II: Raw material arrives in a short window and cannot be held back.

In the light of the above statements, choose the correct answer.

Answer: C

Correct answer: Statement I is incorrect but Statement II is correct

Statement II explains why statement I is wrong. Because the crop arrives in a short window and cannot be held back, the plant must be sized on the peak arrival rate, not on the annual tonnage spread over 365 days. Sizing on the average would leave most of the crop unprocessed and wasted.

Please log in or register to report this question.

36.

Statement I: The slowest stage in a line sets the throughput of the whole plant.

Statement II: Capacity provided at any other stage cannot be used beyond that limit.

In the light of the above statements, choose the correct answer.

Answer: D

Correct answer: Both Statement I and Statement II are correct

Statement II is the consequence of statement I. The slowest stage sets the throughput, and every other stage is then limited to that rate - so capacity installed elsewhere earns nothing until the bottleneck is relieved. This is why line balancing is a capital question, not merely an operating one.

Please log in or register to report this question.

37.

Statement I: A process flow sheet and a plant layout drawing convey the same information.

Statement II: A flow sheet describes the logical sequence of operations while a layout fixes their physical positions.

In the light of the above statements, choose the correct answer.

Answer: A

Correct answer: Statement I is incorrect but Statement II is correct

The two drawings are quite different. A flow sheet is a logical document: what operations occur, in what order, with what streams between them. A layout is a physical one: where each machine stands, how services reach it, and how material and people move. One can be drawn without knowing the other.

Please log in or register to report this question.

38.

Statement I: Unidirectional flow from raw to finished product is required in a food plant layout.

Statement II: Crossing paths will eventually transfer contamination however good the cleaning regime.

In the light of the above statements, choose the correct answer.

Answer: B

Correct answer: Both Statement I and Statement II are correct

Statement II is the reason for statement I. However good the cleaning regime, crossing paths will eventually transfer contamination - on wheels, on clothing, in aerosols - so the separation must be built into the layout rather than managed by procedure. That is why unidirectional flow is a design requirement in food plants.

Please log in or register to report this question.

39.

Statement I: Doubling a plant's capacity roughly doubles its capital cost.

Statement II: Cost scales with capacity raised to a power near 0.6.

In the light of the above statements, choose the correct answer.

Answer: C

Correct answer: Statement I is incorrect but Statement II is correct

Statement II gives the correct relation and refutes statement I. Because cost goes as \(Q^{0.6}\), doubling the capacity multiplies the cost by \(2^{0.6} = 1.52\) - about half again, not twice. The economy of scale arises because a vessel’s cost follows its surface while its capacity follows its volume.

Please log in or register to report this question.

40.

Statement I: Working capital requirements are unusually high in a seasonal plant.

Statement II: A whole year's raw material may have to be bought within a three month season.

In the light of the above statements, choose the correct answer.

Answer: D

Correct answer: Both Statement I and Statement II are correct

Statement II explains statement I. A seasonal plant may have to buy a whole year’s raw material within a three-month season, and then hold the product as stock until it is sold through the year. Both tie up money, which is why working capital in such a plant can rival the fixed investment.

Please log in or register to report this question.

Loading…
Tags: Agro Processing Plant Design Questions and Answers || Agro Processing Plant Design MCQ Questions and Answers || Agro Processing Plant Design GK Questions and Answers || Agro Processing Plant Design GK MCQ Questions || Agro Processing Plant Design Multiple Choice Questions and Answers || Agro Processing Plant Design GK || GK on Agro Processing Plant Design || Agricultural Process Engineering Questions and Answers || Agricultural Process Engineering MCQ Questions and Answers || Agricultural Process Engineering GK Questions and Answers || GK on Agricultural Process Engineering