31.

Assertion (A): Breaking wave impact on a vertical wall can far exceed the quasi-static pressure.
Reason (R): An impulsive impact of very short duration produces a much higher peak pressure.

Answer: C

Both are true and the reason gives the mechanism, and the impulse rather than the peak governs the response. A caisson may survive a pressure that would fail a rigid element outright. Duration matters as much as the peak pressure.

Please log in or register to report this question.

32.

Consider the following statements about wave forces on vertical walls.
1. Impulsive breaking pressures are of very short duration.
2. Structural response depends on the impulse as well as the peak.
3. Peak pressure alone determines whether a caisson will slide.

Answer: D

Correct answer: 1 and 2 only

Statements 1 and 2 are correct: impulsive breaking pressures last only milliseconds, and whether a caisson responds to them depends on the impulse - pressure integrated over time - relative to its inertia, not on the peak alone. Statement 3 is therefore wrong, and it is a dangerous simplification: a very high peak of very short duration may move a massive caisson hardly at all.

Please log in or register to report this question.

Answer: A

Correct answer: sliding, overturning and foundation bearing failure

A caisson is a gravity structure, so it fails as one: it slides horizontally on its rubble base, it overturns about its heel, or the foundation beneath it fails in bearing. All three are checked under the wave pressure distribution given by Goda, including the uplift, which reduces the effective weight and so worsens both sliding and bearing. The other options belong to rubble mounds, concrete armour and dunes.

Please log in or register to report this question.

Answer: B

Sliding as a rigid body is a caisson failure mode rather than a mound one. The other three are the characteristic ways a rubble mound deteriorates. Mound and caisson fail quite differently. Rigid body sliding has no analogue in a mound.

Please log in or register to report this question.

Answer: C

Undermining at the toe removes the support that the armour above depends upon. Toe failure is among the commonest initiating causes of breakwater damage. Many failures can be traced back to the toe. It is also the least accessible part to inspect.

Please log in or register to report this question.

36.

Assertion (A): Toe design deserves as much attention as the armour layer itself.
Reason (R): Loss of support at the toe allows the armour above to slide down.

Answer: D

Correct answer: Both A and R are true, and R is the correct explanation of A

Both are true and the reason gives the mechanism. The armour on a slope is supported from below, so if scour or settlement removes the toe the units above slide down into the hollow, the underlayer is exposed and the damage propagates upward. Toe failure is one of the commonest initiating causes of breakwater damage, which is why the toe is given its own berm of heavy stone and its own scour check.

Please log in or register to report this question.

Answer: A

Tolerable limits are quoted in litres per second per metre for each situation behind. Individual wave volumes are assessed separately where personal safety is at stake. Mean and individual volumes are specified separately.

Please log in or register to report this question.

38.

Match each overtopping assessment quantity with what it measures.
List I
A. Mean discharge
B. Maximum individual volume
C. Number of overtopping waves
D. Overtopping velocity
List II
1. how many waves pass the crest
2. average flow rate per metre run of crest
3. the speed of water arriving behind the crest
4. the largest single overtopping event

Answer: B

Correct answer: A-2, B-4, C-1, D-3

The four quantities answer different questions. The mean discharge, in litres per second per metre run, is what limits are set against. The maximum individual volume matters for the safety of a person or a vehicle, since one large event can be lethal where the mean is acceptable. The number of overtopping waves indicates how often the crest is wetted. The velocity determines the force on anything standing behind.

Please log in or register to report this question.

39.

Assertion (A): Crest level is frequently governed by overtopping rather than strength.
Reason (R): The tolerable discharge for the use behind may demand more freeboard than stability does.

Answer: C

Correct answer: Both A and R are true, and R is the correct explanation of A

Both are true and the reason states the relation. A structure strong enough to survive the design wave may still be too low to keep the overtopping discharge within what a promenade, a road or a building behind can tolerate, so the crest is raised beyond what stability requires. Where the land behind is open and can accept water, the reverse holds and the crest can be lower.

Please log in or register to report this question.

Answer: D

Correct answer: reduces both the runup and the overtopping discharge

A rough, permeable slope dissipates energy in turbulence and percolation within the armour, so the water climbs less far and less of it passes the crest - the roughness factor in the overtopping formulae is as low as 0.4 or 0.5 for rock armour against 1.0 for smooth concrete. The stability of the units is unaffected by their collective roughness; it is set by their individual mass and interlock.

Please log in or register to report this question.

Loading…
Tags: Coastal Structures Design Questions and Answers || Coastal Structures Design MCQ Questions and Answers || Coastal Structures Design GK Questions and Answers || Coastal Structures Design GK MCQ Questions || Coastal Structures Design Multiple Choice Questions and Answers || Coastal Structures Design GK || GK on Coastal Structures Design || Coastal Engineering Questions and Answers || Coastal Engineering MCQ Questions and Answers || Coastal Engineering GK Questions and Answers || GK on Coastal Engineering